-
Sliding Window Roller
-
Sliding Door Rollers
-
Nylon Door Rollers
-
Door Window Handles
-
Door And Window Hinge
-
Aluminium Sliding Window Lock
-
Aluminum Door Closer
-
Aluminium Profile Corner Joint
-
Window And Door Weather Strip
-
Window Latch Lock
-
Door Lock Cylinder
-
Window Screen Mesh
-
Glass Door Hardware Accessories
-
Bathroom Sliding Door Accessories
-
Furniture Hardware Replacement Parts
0.8mm Thick Adjustable Sliding Window Roller SS201 Material 626zz Bearing

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xBearing | 626zz,608zz | Thickness | 1.0mm,1.2mm |
---|---|---|---|
Finish | Chrome Plating | Function | Adjustable |
Material | Iron,SS201 ,SS304,Aluminium Alloy (optional) | Application | Window,Aluminium Sliding Window,Sliding Door Window,wardrobes,Patio Door |
High Light | Sliding Window Roller SS201,0.8mm Thick Sliding Window Roller,Adjustable Sliding Window Roller |
0.8mm Thick Adjustable Sliding Window Roller SS201 Material 626zz Bearing
Specification Of Adjustable Sliding Window Roller
Material | Iron,SS201 ,SS304,Aluminium alloy (optional) |
Thickness | 0.8mm,1.0mm,1.2mm (optional) |
Wheel | Nylon,Fiber nylon ,POM,PP |
Bearing | 626zz,696zz,608zz,6001zz,6200zz,6201zz(optional) |
Finish | Chrome plating ,color plating ,white zice plating ,blue zinc plating(optional) |
size | Different size are available |
Features Of Adjustable Sliding Window Roller
1. Able to bear high load
2. For countless applications: sliding doors, Windows, and other furniture
3. Low noise, stable performance, durable
4. High load-bearing capacity
We mainly produce sliding door wheel, sliding door roller, sliding door roller, sliding door roller, sliding door roller, sliding door roller, dining dustpan, nylon roller, nylon roller, sliding door track, sliding door track. Industrial hardware etc. We have exported our products to USA, Dubai, Spain, Ireland, Israel, Honduras, etc.
We need 15 days to prepare all the stuff then 30 days for manufacturing.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.